venerdì 1 marzo 2013

ADR 2013: important news_Cap1

Among the various changes introduced by the 2013 version of the ADR, the main news in Part 1 are:
Where there is any conflict between the ADR and the standards, the provisions of ADR take precedence (Section 1.1.5).
The importance of staff training, and in particular the Safety Adviser must check that update training on changes to the regulations is included as appropriate (Section 1.8.3).
A time limit of one month from the date of occurrence has now been imposed for submission of accident reports to a Competent Authority (Section 1.8.5).
Transport units carrying more than 8 tonnes of Limited Quantities are now prohibited in a Category
E tunnel (Section 1.9.5).
To learn more new ADR 2013, refer to the reading of the text of ADR.

Tra le varie modifiche introdotte dalla versione 2013 dell’ADR, vediamo le principali novità nella Parte1:
Quando ci sia conflitto tra l’ADR e le altre normative di cui è richiesta l’applicazione, prevalgono le disposizioni dell’ADR (Capitolo 1.1.5).
Viene sottolineata l’importanza della formazione del personale addetto, e in particolare il Consulente deve verificare che la formazione del personale addetto sia aggiornata e documentata (Capitolo 1.8.3).
Viene individuato il tempo massimo di un mese dalla data dell’evento per la redazione della Relazione d’Incidente alle Autorità competenti (Capito 1.8.5) – mentre il DLgs 35/10 stabilisce questo limite a 45 giorni.
Le unità di trasporto che trasportano più di 8 tonnellate di Quantità limitate sono ora vietate nelle gallerie di categoria E.
Per approfondire le novità dell’ADR 2013 si rimanda alla lettura del testo dell’ADR.


Nessun commento:

Posta un commento